2013

Project leader on the new city line i
Client: Trafikverket 2010-2013
Project management-Refurbishment of Roslagsbanans rolling stock i
Client: Faiveley Transport Nordic Landskrona 2010-2013
Accident investigation. i
Client: SLL Trafikförvaltningen 2013

2009

Railenergy i
Client: The Swedish Railway Administration (Banverket, BV) 2006-2009
Management of high speed testing i
Client: Botnia line 2008-2010

2008

Main responsible for EMR delivery of maintenance of passenger coaches i
Client: EuroMaint Rail (EMR) 2007-2008
Uppsala PRT i
Client: Vectus 2006-2008
View installation i
Client: EuroMaint Rail (EMR) 2007-2008
Maintenance of the vehicles belonging to Ofotbanen. i
Client: Ofotbanen AS 2007-2008

2007

Maintenance of service vehicles i
Client: Tågia AB 2007

2006

Bid manager vehicle system engineering i
Client: Bombardier Transportation 2005-2006
Typical train data i
Client: The Swedish Railway Administration (Banverket, BV) 2005-2006
Tågia AB i
Client: Tågia AB 2006

2005

Tender for the operation of Stckholm commuter trains i
Client: Keolis SA 2005-2006
Contracting of Rolling Stock technical administration i
Client: Swedish State Railways 2003-2005
Risk Analysis as regards introduction of new rolling stock and a new depot i
Client: Citypendeln (Keolis), Stockholm, Sweden 2005
X40 Maintenance Documentation i
Client: Alstom Transport 2003-2005

2004

Arlanda Express Settlement Agreement. i project page
Client: A-Train (operator of Arlanda Express) 2002-2004
Establishment of strategic plan for the Rolling Stock i project page
Client: Swedish State Railways 2004
Contracting of Rolling Stock heavy maintenance i
Client: Swedish State Railways 2004
Establishment of a Rolling Stock Unit at the Swedish State Railways i project page
Client: Swedish State Railways 2003-2004
Visual Inspection System i project page
Client: Swedish State Railways 2003-2004

2003

Nose Cone redesign i project page
Client: A-Train (operator of Arlanda Express) 2002-2003
Project management and system integration of a new signalling system i project page
Client: Bombardier Transportation 2001-2003

2002

Supervision of the delivery of the Arlanda Express vehicles i project page
Client: A-Train (operator of Arlanda Express) 1997-2002

2001

Authority Approvals of Coradia Duplex X40 i project page
Client: Alstom Transport 2001-2005
 Project leader on the new city line
Project leader on the new city train line.
 Project management-Refurbishment of Roslagsbanans rolling stock
Project management - delivery of doors, retractable footsteps and IT network solution including video surveillance and passanger information. The project is part of the modernisation of 101 wagons designated for Roslagsbanan.
 Accident investigation.
Accident investigation of the train crash in Saltsjöbaden in january 2013.
 Railenergy
Railenergy is a research project within the EU R&D framework program. Transrail's part in the project is to manage a work package regarding energy efficient operation. This includes energy efficient driving and timetabling.
 Management of high speed testing
Management of the high speed texting to verify railway functionality on the Botnia line. Specifications, procurement, test execution and reporting.
 Main responsible for EMR delivery of maintenance of passenger coaches
During a period of 6 months EMR needed assistance to manage their maintenance of SJAB fleet of 441 passenger coaches. At the same time an improvement program should be carried out. The work included daily issues as regards the maintenance at the workshops, various problems management and technical problems etc. Among other things an internet based IT-tool to manage and monitor the maintenance production was developed.
 Uppsala PRT
Project management and system engineering of a PRT test track in Uppsala. Apart from many challenges, technical and others, Transrail is responsible to ensure the project target of a safety approval by the Swedish Rail Agency.
 View installation
Installation of a new wheel profile and pad thickness measurement equipment in the Bro depot as well as adoption of the View data to Euromaint's internal computer network
 Maintenance of the vehicles belonging to Ofotbanen.
Project management and planning of the maintenance including compiling of maintenace documentation
 Maintenance of service vehicles
Planning of the maintenance of the service vehicles on the SL network
 Bid manager vehicle system engineering
Bid manager for system engineering (vehicles). During the assignment proposals for Rome Line C, Flytoget internediate cars (Norway), Budapest Metro and Iran Metros were produced.
 Typical train data
Market analysis and classification of European rolling stock for passenger services, with focus on high-speed traffic. Transrail compiled and proposed representative technical data for different types of rolling stock, for instance with regard to traffic simulation studies.
 Tågia AB
Course on Project Management specific for Tågia. The work included development of a project management manual for Tågia.
 Tender for the operation of Stckholm commuter trains
Project management and other consultancy participation for Keolis tendering for this contract, including traffic and station services.
 Contracting of Rolling Stock technical administration
Technical and commercial support in the public procurement ("LoU"), evaluation and contracting of the technical administration of the rolling stock. Continuation of the work to establish a rolling stock unit, additional business process analysis.
 Risk Analysis as regards introduction of new rolling stock and a new depot
Development of a risk analysis including mitigation strategies for the migration to new commuter trains in the Stockholm area, requiring new schedules for staff, maintenance and operation. At the same time, a new depot was to be taken into operation.
 X40 Maintenance Documentation
Maintenance documentation for new regional trains (X40) to SJ AB (Sweden). Assignment includes project management assistance, assistance in customer relations, review of the documenation before delivery and, finally, translation of the documentation to Swedish.
 Arlanda Express Settlement Agreement.
Management of the Settlement Agreement action plan to finalise the delivery of the rolling stock. The plan included technical issues to be finalised by the supplier in order to receive customer acceptance.
 Establishment of strategic plan for the Rolling Stock
Establishment of strategic plan for the rolling stock, with recommendations on financially viable renovations and status upgrades. The work included also the establishing of maintenance programmes and take over of technical documentation.
 Contracting of Rolling Stock heavy maintenance
Technical and commercial support in the public procurement ("LoU"), evaluation and contracting of heavy maintenance. In addition establishment of maintenance programmes, analysis of material need and compiling + creation of maintenance documentation.
 Establishment of a Rolling Stock Unit at the Swedish State Railways
Organisational analyis and establishment of a Rolling Stock Unit with the purpose of renting vehicles to operators. Vehicle take-over from SJ AB, rental contracts for operators, initial technical administration of the fleet.
 Visual Inspection System
Development of a system for vehicle status inspections before/after rental periods. Managing the inspections when the vehicles were taken over by ASJ from SJ AB
 Nose Cone redesign
Already at the design reviews A-Train had concerns about the GRP nose cone. Latrer, operational experience shoved that a redesign was needed. The modification of an existing design would be difficult, and Transrail was entrusted with the task to manage this work on behalf of ATrain.
 Project management and system integration of a new signalling system
Management of the signalling aspect of the renewal of Line 2 of the Bucharest Metro. The work included delivery of a traffic control center, the driver cab displays, and the trackside equipment.
 Supervision of the delivery of the Arlanda Express vehicles
In 1997 A-Train engaged Transrail to assist in customer management of the GEC-Ahlstom (Alstom) delivery of the Arlanda Express shuttle trains. Reviewing design, manufacturing and project schedule Transrail staff also supervised manufacturing and type/commissioning tests, and before traffic start identified and supervised necessary modifications of the trains
 Authority Approvals of Coradia Duplex X40
Management of the Authority Approvals Process for the new double-decker regional trains to SJ AB (Sweden). Establish an Approvals Dossier, with all authority requirements, set up the approvals process and assist the supplier to fulfil the requirements.