2014

Cooperation project for efficient railway traffic. i
Client: EU 2011-2014

2013

Project leader on the new city line i
Client: Trafikverket 2010-2013

2012

Maintenance system for Euromaint i
Client: Euromaint 2012

2009

Assessment of iron ore railway operation i
Client: SAMI Corporation 2009

2008

Uppsala PRT i
Client: Vectus 2006-2008
Studies of capacity, problems, solutions and possible effects in and around Hallsberg i
Client: The Swedish Railway Administration (Banverket, BV) 2008

2007

Railway container transports to/from a new container port in Norvik outside Stockholm. i
Client: Ports of Stockholm 2006-2007
Cost comparison of different options for connecting a future depot in Södertälje to Banverket's tracks i
Client: SL (Stockholm Public Transport Authority) 2007
Investigation concerning traffic issues due to an idea of removing a level crossing in Knivsta i
Client: Mentra Block 2007

2006

High-speed train operation in winter climate i
Client: The Swedish Railway Administration (Banverket, BV) 2005-2006

2005

Analysis of the European market for new rolling stock i
Client: Swedish State Railways 2005
Uppsala C railway station
Client: The PTA of Uppland 2005
Railway Standardisation i
Client: The Swedish Railway Administration (Banverket, BV) 2005

2004

Training material for the Eskisehir Tramway (Turkey) i
Client: Bombardier Transportation 2003-2004

2003

Prognosis for the future fleet of railway rolling stock in Sweden i
Client: The Swedish Railway Administration (Banverket, BV) 2002-2003
Future market of high speed trains i project page
Client: The Swedish Railway Administration (Banverket, BV) 2003
Systems design of the Eskisehir Tramway (Turkey) i project page
Client: Bombardier Transportation 2001-2003
Project management and system integration of a new signalling system i project page
Client: Bombardier Transportation 2001-2003

2001

Review of the Yugoslavian Railways for a rebuilding plan i
Client: Swedish International Development Agency (through Hifab International) 2001

2000

Regional and commuter train systems south of Stockholm i
Client: The communities of Södertälje and Gnesta 2000

1999

Vision for the railway traffic in central Sweden i
Client: The Swedish Railway Administration (Banverket, BV) 1998-1999
Study on the traffic capacity on the line from the south into Stockholm Central Station, Sweden i
Client: SJ (Swedish State Railways) 1999
Arranging and managing of seminars on the new EU Directives i
Client: The Swedish Railway Administration (Banverket, BV) 1999

1996

Trains and Railway System of the Future i
Client: European Commission, DGVII-E, Brussels 1996
Review of the ERTMS specifications. i
Client: ERRI (European Railway Research Institute), Holland 1996
 Cooperation project for efficient railway traffic.
The OnTime-project aims to increase railway capacity by reducing delays and improving traffic fluidity.
 Project leader on the new city line
Project leader on the new city train line.
 Maintenance system for Euromaint
System that displays information about damages and planned maintenance of railway vehicles, connected to routes and timetable.
 Assessment of iron ore railway operation
Assessment of a heavy iron ore railway in northern Brazil. The mission included the entire railway operation of the 900 km line (vehicles, signalling, fixed installations, maintenance, operation, train control and safety issues).
 Uppsala PRT
Project management and system engineering of a PRT test track in Uppsala. Apart from many challenges, technical and others, Transrail is responsible to ensure the project target of a safety approval by the Swedish Rail Agency.
 Studies of capacity, problems, solutions and possible effects in and around Hallsberg
Analysis of earlier reports and studies concering capacity, solutions and possible effects in and around Hallsberg
 Railway container transports to/from a new container port in Norvik outside Stockholm.
The Ports of Stockholms intend to relocate the container port in central Stockholm to Norvik in Nynäshamn. The study is an analysis of how railway transports of containers between Norvik and Stockholm/central Sweden could be designed in a competitive way compared to road transport.
 Cost comparison of different options for connecting a future depot in Södertälje to Banverket's tracks
Analysis of some costs related to production and public economy concerning two different connections between a future depot in Södertälje and Banverkets tracks.
 Investigation concerning traffic issues due to an idea of removing a level crossing in Knivsta
Analysis of traffical issues such as reduced travel time, higher capacity, less traffic disturbances and better safety if the level crossing in Knivsta is removed.
 High-speed train operation in winter climate
A study on winter problems as regards high-speed passenger train services in the Nordic countries. The study was carried out as part of the BV research project "The green train". The main purpose of the study has been to complie primarily Scandinavian knowledge and experiences.
 Analysis of the European market for new rolling stock
Analysis of the present and future European rolling stock market. Based on the analysis Transrail made an assessment of the factors that affect the Swedish rolling stock market in general and ASJ’s activities in specific.
 Uppsala C railway station
No description
 Railway Standardisation
Development of a proposal to make Swedish participation in European railway standardisation more efficient.
 Training material for the Eskisehir Tramway (Turkey)
Development of training material (course plan and description, course overheads, check-up questions) for the technical overview course of the Eskishir Light Rail Transit System and its operation.
 Prognosis for the future fleet of railway rolling stock in Sweden
Forecast on the future fleet and technical standards of railway rolling stock in Sweden. The objective was to identify how trends within rolling stock development would influence the Swedish infrastructure and its standards.
 Future market of high speed trains
Forecast on the future rolling stock in Sweden and its technical standards. Identifying rolling stock trends and their impact on the infrastructure and its standards.
 Systems design of the Eskisehir Tramway (Turkey)
System design of the Eskisehir Tramway in Turkey including integration with other transport services, routes, system performance, safety aspects, normal and disrupted traffic. It provided high-level system design requirements and support for the municipality approval of design parameters.
 Project management and system integration of a new signalling system
Management of the signalling aspect of the renewal of Line 2 of the Bucharest Metro. The work included delivery of a traffic control center, the driver cab displays, and the trackside equipment.
 Review of the Yugoslavian Railways for a rebuilding plan
This project to define a short term international investment plan for Yugoslavian Railways was commissioned by the Swedish International Development Agency. Transrail made technical reviews of infrastructure, rolling stock and maintenance facilities, and project prioritisation.
 Regional and commuter train systems south of Stockholm
Feasibility and idea study on a more efficient regional and commuter train system into Stockholm from the south. Means to improve the commuter traffic south of Södertälje were studied. An idea of great potential was the integration of regional and commuter train services at the Södertälje Syd station.
 Vision for the railway traffic in central Sweden
Management of workshops, plus a vision for future passenger and freight railway traffic in central Sweden. The aim was to develop the competence of the BV Middle Region staff and to create input for their infrastructure planning activities. Cooperation with the Swedish consultancy company Transek.
 Study on the traffic capacity on the line from the south into Stockholm Central Station, Sweden
Study on traffic capacity on the line Älvsjö-Stockholm C (south entrance to Stockholm C).
 Arranging and managing of seminars on the new EU Directives
Seminars in order to present and discuss the new EU Directives with parties of the Swedish railway industry.
 Trains and Railway System of the Future
Contract by the European Commission to draft the railway R&D program within the 4th Framework Program.
 Review of the ERTMS specifications.
Participation in the review of ERTMS (European Railway Traffic Management) Specifications, specifically representing the Swedish railway sector.