2014

CATO Study for Vattenfall i
Client: Vattenfall 2013-2014
Implementation of Lean at Sporveien Rolling Stock maintenance i
Client: Sporveien Oslo 2013

2013

Assessment of rollingstock i
Client: SEB 2013
Project management-Refurbishment of Roslagsbanans rolling stock i
Client: Faiveley Transport Nordic Landskrona 2010-2013
Field test for Green Cargo. i
Client: Green Cargo 2012
Quality review of documents preceeding purchase of new tram's for Gothenburg Tramways. i
Client: Gothenburg Tramways 2012

2012

Maintenance system for Euromaint i
Client: Euromaint 2012
Prestudie Lean. i
Client: Sporveien Oslo 2012

2011

Analysis for Trafikverket. i
Client: Trafikverket 2010
Swedish requirements on high speed trains i
Client: Trafikverket 2010

2010

Predictable adhesion heavy trains i
Client: The Swedish Traffic Authority (Trafikverket) 2010
CATO - Energy optimized train operation i
Client: The Swedish Traffic Authority (Trafikverket) and LKAB 2009-2010
Procedures and tools for handling damage reports i
Client: SJ 2010
Maintenance of the freight car dispatching system Vadis i
Client: Green Cargo 2010

2009

Decision support on concept and produktion for new metro car i
Client: SL (Stockholm Public Transport Authority) 2009

2008

The RS workshops of Skånetrafiken
Client: Skånetrafiken, PTA in the south of Sweden 2008
Main responsible for EMR delivery of maintenance of passenger coaches i
Client: EuroMaint Rail (EMR) 2007-2008
Technical Controller i
Client: Veolia Transport Sverige 2006-2008
View installation i
Client: EuroMaint Rail (EMR) 2007-2008
Maintenance of the vehicles belonging to Ofotbanen. i
Client: Ofotbanen AS 2007-2008

2007

Maintenance of service vehicles i
Client: Tågia AB 2007

2006

High-speed train operation in winter climate i
Client: The Swedish Railway Administration (Banverket, BV) 2005-2006
Rail vehicles and maintenance in Serbia i
Client: ÅF Infrateknik 2006
Safety revision of EuroMaint suburban train maintenance i
Client: Stockholmståg 2006
Tågia AB i
Client: Tågia AB 2006

2005

Tender for the operation of Stckholm commuter trains i
Client: Keolis SA 2005-2006
Tender for operation of the traffic system "Tåg i Bergslagen" i
Client: Keolis SA 2005
Risk Analysis as regards introduction of new rolling stock and a new depot i
Client: Citypendeln (Keolis), Stockholm, Sweden 2005
X40 Maintenance Documentation i
Client: Alstom Transport 2003-2005
X60 Maintenance Documentation i
Client: Alstom Transport 2004-2005

2004

Establishment of strategic plan for the Rolling Stock i project page
Client: Swedish State Railways 2004
Contracting of Rolling Stock heavy maintenance i
Client: Swedish State Railways 2004
X60 Maintenance Analysis i
Client: Citypendeln (Keolis), Stockholm, Sweden 2004
Documents for operation of the Eskisehir Tramway (Turkey) i project page
Client: Bombardier Transportation 2003-2004

2003

Maintenance of the Stockholm commuter trains in the future. i
Client: Citypendeln (Keolis), Stockholm, Sweden 2003
Eskisehir LRTS System Training i
Client: Bombardier Transportation 2003

2002

Software tool to evaluate operational and maintenance statistics i project page
Client: A-Train (operator of Arlanda Express) 1999-2002
Railway Rolling Stock Maintenance Services in Sweden i project page
Client: Mantena AS (Norge)

2001

Railway Rolling Stock Maintenance Services in Sweden i
Client: Siemens AB 2001

2000

Roles and responsibilities for traffic safety and vehicle development. i
Client: SJ (Swedish State Railways), BV (Swedish Railway Adminstration) 1998-2000
Workshop manual for A-Train i project page
Client: A-Train (operator of Arlanda Express) 1999-2000
Strategic development plan for the Kosovo railways i
Client: Swedish International Development Agency (through Hifab International) 2000
Software for the calculation of train crew payments i
Client: Tågkompaniet 2000

1999

Assessment of the Swedish market of Railway Rolling Stock Services
Client: Alstom Transport 1999
Tender for the operation of the train services Malmö-Gothenburg, Sweden i
Client: Via GTI (Keolis) – BK-tåg – Go Ahead Group 1998-1999
Maintenance documentation for the vehicles of BV Production i
Client: The Swedish Railway Administration (Banverket, BV) 1999

1998

Tender for the operation of the commuter train services in Stockholm, Sweden i
Client: Via GTI (Keolis) – BK-tåg – Go Ahead Group 1998
Production control system at the Hagalund depot i
Client: SJ (Swedish State Railways) 1998
Specification for refurbishment of suburban trains. i
Client: SL (Stockholm Public Transport Authority) 1998

1997

Life Cycle Cost (LCC) study. i
Client: Fiat Ferroviaria SpA, Italy 1997

1996

Eurotunnel shuttle traction and rolling stock i
Client: Eurotunnel, UK 1996
Maintenance of Copenhagen Minimetro Rolling Stock i
Client: Carl Bro Industri & Marine as, Copenhagen
 CATO Study for Vattenfall
Study of the possibilities to implement a CATO driver assistance system to the locomotive drivers on the Vattenfall Mining network in the Cottbus area in Germany.
 Implementation of Lean at Sporveien Rolling Stock maintenance
Assistance with the start-up of Lean management for the maintenace of Oslo metro and trams (Sporveien Oslo).
 Assessment of rollingstock
Assessment of the changes in value for different Swedish EMU:s (Electric Multiple Unit) during the expected remaining lifetime.
 Project management-Refurbishment of Roslagsbanans rolling stock
Project management - delivery of doors, retractable footsteps and IT network solution including video surveillance and passanger information. The project is part of the modernisation of 101 wagons designated for Roslagsbanan.
 Field test for Green Cargo.
Field test of the diesel consumption and the train running resistance on the line between Vännäs-Storuman and a analysis of the energy savings that can be made, using CATO.
 Quality review of documents preceeding purchase of new tram's for Gothenburg Tramways.
Quality review of underlying documents preceeding the purchase of new tram's for Gothenburg Tramways. Contribute to a successful conclusion of the purchase by doing an independent quality review of the offer inquiry including the background material.
 Maintenance system for Euromaint
System that displays information about damages and planned maintenance of railway vehicles, connected to routes and timetable.
 Prestudie Lean.
A prestudy on the implementation of Lean management processes of Oslo Metro and Oslo Tram operations.
 Analysis for Trafikverket.
Analysis and investigation of the requirements for efficient maintenance of vehicles.
 Swedish requirements on high speed trains
This project made part of the Swedish research program Gröna Tåget. The project included an inventory of all international and national standards and requirements affecting the design of high speed trains in Sweden.
 Predictable adhesion heavy trains
Development of theory, model and softvare for prediction of adhesion for heavy trains.
 CATO - Energy optimized train operation
R&D and demonstration project to implement CATO for train dispatchers in Boden and in 2 locomotives at LKAB in order to run test operation on Malmbanan. CATO is integrated with the planning system STEG at Trafikverket from where it recieves real-time information about the operational timetable. Timetable is interpreted as target points for the trains, which are then used to optimize the speed profiles so that the trains both follow the timetable exactly and are run in an energy optimal way.
 Procedures and tools for handling damage reports
Development of routines, procedures and tools for creating damage reports.
 Maintenance of the freight car dispatching system Vadis
Maintenance of Green Cargo's optimization system Vadis for freight cars in wagon load traffic.
 Decision support on concept and produktion for new metro car
Decision support and proposal regarding veichle concept, migrationplan, maintenance/depot and production pattern for the new metro car C30.
 The RS workshops of Skånetrafiken
No description
 Main responsible for EMR delivery of maintenance of passenger coaches
During a period of 6 months EMR needed assistance to manage their maintenance of SJAB fleet of 441 passenger coaches. At the same time an improvement program should be carried out. The work included daily issues as regards the maintenance at the workshops, various problems management and technical problems etc. Among other things an internet based IT-tool to manage and monitor the maintenance production was developed.
 Technical Controller
Full time engagement as Technical Controller at the department for Safety and Technology. The department is responsible for maintenance and other aspects as regards the rolling stock used on the Stockolm underground and tramways, which are operated by Veolia.
 View installation
Installation of a new wheel profile and pad thickness measurement equipment in the Bro depot as well as adoption of the View data to Euromaint's internal computer network
 Maintenance of the vehicles belonging to Ofotbanen.
Project management and planning of the maintenance including compiling of maintenace documentation
 Maintenance of service vehicles
Planning of the maintenance of the service vehicles on the SL network
 High-speed train operation in winter climate
A study on winter problems as regards high-speed passenger train services in the Nordic countries. The study was carried out as part of the BV research project "The green train". The main purpose of the study has been to complie primarily Scandinavian knowledge and experiences.
 Rail vehicles and maintenance in Serbia
Study in Serbia of all types of rail vehicles regarding their availability and maintenance. The study also includs proposals of improvements to get better efficiency
 Safety revision of EuroMaint suburban train maintenance
System revision (safety audit) of EuroMaint Rail’s maintenance of the rolling stock in SL’s commuter train traffic.
 Tågia AB
Course on Project Management specific for Tågia. The work included development of a project management manual for Tågia.
 Tender for the operation of Stckholm commuter trains
Project management and other consultancy participation for Keolis tendering for this contract, including traffic and station services.
 Tender for operation of the traffic system "Tåg i Bergslagen"
Participation in Keolis tender for the regional passenger services in Bergslagen (middle Sweden). Transrail made the staff schedules and traffic plans, rolling stock circulations and maintenance parts of the tender. Transrail also conducted a SWOT-analysis and a pre-study prior to the tender.
 Risk Analysis as regards introduction of new rolling stock and a new depot
Development of a risk analysis including mitigation strategies for the migration to new commuter trains in the Stockholm area, requiring new schedules for staff, maintenance and operation. At the same time, a new depot was to be taken into operation.
 X40 Maintenance Documentation
Maintenance documentation for new regional trains (X40) to SJ AB (Sweden). Assignment includes project management assistance, assistance in customer relations, review of the documenation before delivery and, finally, translation of the documentation to Swedish.
 X60 Maintenance Documentation
Maintenance documentation for new commuter trains (X60) to Stockholm Local Transport (Sweden). The assignment includes translation of the documentation to Swedish.
 Establishment of strategic plan for the Rolling Stock
Establishment of strategic plan for the rolling stock, with recommendations on financially viable renovations and status upgrades. The work included also the establishing of maintenance programmes and take over of technical documentation.
 Contracting of Rolling Stock heavy maintenance
Technical and commercial support in the public procurement ("LoU"), evaluation and contracting of heavy maintenance. In addition establishment of maintenance programmes, analysis of material need and compiling + creation of maintenance documentation.
 X60 Maintenance Analysis
Stockholm Local Transport (SL) is replacing old commuter trains with a new X60 type by Alstom requiring new schemes for maintenance and operation. In parallel a new depot is taken into operation. The analysis identifies how to operate and organise the maintenance system of the commuter train services, including necessary investments and other measures.
 Documents for operation of the Eskisehir Tramway (Turkey)
Following previous work on system design of the new Eskisehir Tramway (Turkey), Transrail was assigned by the supplier (Bombardier Transportation) to draft the necessary documentation for mobilisation and operation of the system.
 Maintenance of the Stockholm commuter trains in the future.
Study on the future conditions for maintenance of the Stockholm commuter trains, considering the migration to a new fleet witch is not compatible with the old vehicles and the introduction of a new second depot.
 Eskisehir LRTS System Training
Following previous work on system design of the new Eskisehir Tramway (Turkey), Transrail was assigned by the supplier (Bombardier Transportation) to develop a course for system training of the operator's staff.
 Software tool to evaluate operational and maintenance statistics
During the first years of operation of the Arlanda Express, Transrail managed the reliability monitoring programme. Information on traffic and vehicle disturbances from drivers, the traffic control centre and the workshop was compiled in a database, enabling analysis of train and subsystem reliability, traffic consequences and maintenance actions.
 Railway Rolling Stock Maintenance Services in Sweden
Mantena wanted to expand their business to Sweden. They needed to know who their potential customers are, a broader knowledge of the market and specific advance notice on maintenance procurements. Transrail helped them with this and the strategies for a Swedish establishment.
 Railway Rolling Stock Maintenance Services in Sweden
In 2001 the Swedish government launched a process to sell EuroMaint, former technical division of SJ, and still Sweden’s largest railway rolling stock maintainer. During the international bidding Siemens Transportation contracted Transrail for part of the due diligence. After due consideration Siemens withdraw from bidding, and later on the selling process was stopped.
 Roles and responsibilities for traffic safety and vehicle development.
Study performed as a step in the reorganisation of the state-dominated railway sector, to propose a future sector organisation regarding roles and responsibilities for traffic safety and vehicle development. The study used the aviation sector as a benchmark and was based on round table discussions with railway organisation representatives.
 Workshop manual for A-Train
Writing of a depot manual for the Arlanda Express depot at Blackvreten. The manual covers the organisation of the depot, rules and routines of work, responsibilities, control activities, safety regulations and reviews.
 Strategic development plan for the Kosovo railways
Review of the rolling stock and maintenance organisation of Kosovo railways, estimates on the need of different types of rolling stock and status of existing rolling stock. The study was part of a strategic development plan for Kosovo railways, carried out by Hifab International.
 Software for the calculation of train crew payments
In 2000 the private operator Tågkompaniet took over the contract to operate the night-train services to the north of Sweden from SJ. Transrail was contracted by both parties for a taking over status review of the rolling stock (110 vehicles). Review instructions were developed, a team organised and the controls were carried out during a short time period.
 Assessment of the Swedish market of Railway Rolling Stock Services
No description
 Tender for the operation of the train services Malmö-Gothenburg, Sweden
Design of the traffic system for the Swedish west coast mainline Malmö-Gothenburg, construction of vehicle circulation patterns etc. Estimates on the required number of rolling stock. Advice on rolling stock maintenance issues.
 Maintenance documentation for the vehicles of BV Production
Preparation of maintenance documenation for the BV fleet of rolling stock used for railway construction and maintenance.
 Tender for the operation of the commuter train services in Stockholm, Sweden
Design of the offered trafic and maintenance system, including necessary resources. Citypendeln won the contract to operate the Stockholm commuter train services 2000-2005.
 Production control system at the Hagalund depot
Development of a vision for a future production control system at the Swedish State Railway´s rolling stock maintenance depot at Hagalund in Stockholm (this is the largest depot of SJ).
 Specification for refurbishment of suburban trains.
Drafting of a specification for the modernisation of existing suburban trains in the Stockholm area.
 Life Cycle Cost (LCC) study.
Conducting an early Life Cycle Cost (LCC) study for a rolling stock tender.
 Eurotunnel shuttle traction and rolling stock
Independent review of the fitness for purpose of the traction and rolling stock.
 Maintenance of Copenhagen Minimetro Rolling Stock
Participation in tender evaluations and contracting for the new Copenhagen Minimetro total rail project. Transrail was responsible for the Rolling Stock maintenance aspects.